Home Menu2025 Capital Engineering Projects
The following current capital projects, under the responsibility of the Engineering Department, have been approved for funding by the Radnor Township Board of Commissioners.* For additional information on any of these projects, please contact engineeringcapitalprojects@radnor.org. Thank you.
| ACTIVE ENGINEERING DEPARTMENT CAPITAL PROJECTS (4/11/2025) | ||||
| Name | Description | Under Construction | To Be Advertised for Construction Bids | Development Underway |
| S. Devon Area Flood Reduction & West Wayne Preserve Wooded Wetlands Restoration & Habitat Enhancement | Continuation of the project under the Landscape Maintenance Program at the West Wayne Preserve & Friends of Radnor Trails Park | 2025 | ||
| Conestoga Ave & S. Devon Ave Crosswalk | Installation of Rectangular Rapid Flashing Beacon, Americans with Dissabilities Act (ADA) ramps & crosswalk striping | 2025 | ||
| Willows Park Driveway & Parking Lot Resurfacing | Milling & repaving the driveways & parking lots | 2025 | ||
| E. Lancaster Ave & N. Aberdeen Ave Traffic Signal Replacement | Traffic signal replacement | 2025 | ||
| Public Works Garage Parking Lot Resurfacing | Milling & repaving parking lot | 2025 | ||
| Electric Municipal Vehicle Charging Stations | Installation of eight electric vehicle charging stations, two of which are fast charge | 2025 | ||
| Superpave Program 2025 | Annual resurfacing of various Township roadways | 2025 | ||
| Lancaster Ave Traffic Adaptive (East) System | Installation of Traffic Adaptive Signals for the intersections from Chamounix Rd to Lowry's Ln | 2025 | ||
| Lancaster Ave & N/S Wayne Ave ADA Ramps Improvements | Installation of proper ADA ramps on each of the four corners | 2025 | ||
| Township Facilities Roof Replacement & Solar Panels | Replacement of the roofs of the Public Works Garage & Administration Building and of the Municipal Building and the installation of solar panels on each of these roofs | 2025 | ||
| Township-Wide Sanitary Sewer Televising & Assessment Program | Televising of the sanitary sewer system throughout the Township & a determination of where repairs may be needed | 2025 | ||
| Wayne Master Plan | Development of a community-driven plan for the vision and goals for Downtown Wayne in conjuction with the Delaware Valley Regional Planning Commission | 2025 | ||
| Municipal Separate Storm Sewer System/Pollutant Reduction Plan (MS4/PRP) | Identification, prioritization and reporting best management practices to meet required stormwater sediment reductions | 2025 | ||
*There is another list of projects, which also includes those from other departments that are currently unfunded for future phases.