#B-07-012
Tree Pruning and Stump Grinding |
September 20, 2007
2 p.m. |
The intent of this specification is to describe the removal of various trees along the Township roadways and parks. |
View Results (PDF) |
#B-07-011
Purchase and Installation Of Two Pre-emption Systems |
September 20, 2007
2 p.m. |
The scope of work for this bid consists of the installation of Pre-Emption at the following two intersections:
1) Conestoga Rd at South Ithan Ave.
2) Bryn Mawr Ave. at Mill Rd. |
View Results (PDF) |
#B-07-006
Purchase Of Gasoline and Diesel Fuel, Hydraulic Fluid, Automatic Transmission Fluid, Motor Oil, and Lubricants |
July 19, 2007
2 p.m. |
Purchase of gasoline and diesel fuel, hydraulic fluid, automatic transmission fluid, motor oil, and lubricants for use by Radnor Township for the next 12 months. |
View Results (PDF) |
#B-07-007a (rebid)
Line Striping Of Roads in Radnor and Middletown Townships |
August 9, 2007
2 p.m. |
Short line striping in Radnor Township and long line striping in Radnor Township and Middletown Township. |
View Results (PDF) |
#B-07-008
Purchase and Installation Of Emergency Generator Systems at Four Pumping Stations |
July 5, 2007
2 p.m. |
The purchase and installation of emergency generator sytstems at four pumpning stations. |
View Results (PDF) |
#B-07-009
Radnor Way Sanitary Sewer Extension |
July 11, 2007
2 p.m. |
Extension of existing sanitary sewers at Radnor Way. |
View Results (PDF) |
#B-07-003a
Radnor Middle School Stormwater Management System |
July 18, 2007
2 p.m. |
No Details
|
View Results (PDF) |
#B-07-010
Brook Street Park Development
|
August 23, 2007
2 p.m.
|
Park Development
|
View Results (PDF)
|